Project Overview
For Nancy and John, this project was deeply personal. They were not building an investment unit. They were building a safe, independent home for their daughter.
Her existing living situation was unstable and unsafe, and they wanted to change that. The goal was to convert their garage into a legal, fully self-contained bachelorette ADU that would allow their daughter to live autonomously, securely, and with dignity.
They chose Frontier Building Group to manage the entire process, from design and permits through to construction.

Project Details
- Location: Brantford, Ontario
- Project Type: Garage Conversion to Legal ADU (Bachelorette Suite)
- Clients: Nancy + John
- Delivery Model: Design + Permits + Build
- Timeline: Approx. 8 months total
- 3 months design and permits
- 2 months preparation
- 3 months construction
- Budget Range: $170,000–$200,000
- Unit Type: Open-concept studio ADU
From Design and Permits to Final Walkthrough
Ready to see the finished results? Browse the full photo gallery and video.
View the Completed Project Gallery
The Challenge
At first, this appeared to be a straightforward garage conversion.
That changed quickly. Once demolition began, Frontier Building Group uncovered significant hidden issues that dramatically altered the scope of the project:
- A carpenter ant colony had caused extensive structural rot and decay
- Squirrel nests were discovered in the walls and roof, indicating long-term infestation
- Structural integrity of the garage was compromised beyond surface-level repair
This was no longer a cosmetic renovation. It became a full structural rebuild, required to ensure long-term safety, durability, and code compliance.
The Frontier Building Group Solution
Frontier Building Group acted decisively and took full ownership of the problem, guiding the clients through the implications and next steps while protecting the integrity of the project.
Structural & Building Envelope
- Coordinated professional extermination to eliminate the carpenter ant colony and address squirrel infestation
- Removed all compromised materials, rot, decay, and nesting areas
- Fully reframed and rebuilt the structure to modern standards
- Restored structural integrity to ensure the building would perform safely for decades
To transform the former garage into a welcoming home:
- Converted the overhead garage door opening into a warm, residential entry with a glass panel door, sidelight, and large window
- Installed a 5-foot patio door providing garden access and abundant natural light
Mechanical & Electrical
To support full independence, Frontier Building Group installed:
- Separated power and water services from the main house
- Full electrical and plumbing systems sized for daily living
- Efficient systems designed for comfort, reliability, and ease of use
Interior Layout & Features
The finished ADU was designed as a bright, open-concept bachelorette suite, making the most of the compact footprint while maintaining privacy and comfort.
The Completed Suite Includes
- Open-concept layout with sitting, sleeping, and dining zones
- Full kitchen with custom cabinetry and island
- In-suite laundry
- 3-piece bathroom with custom tiled shower walls
- Large windows and patio door for natural light and outdoor connection
Style & Finish Level
- Good-to-better quality finishes throughout
- Standout custom elements in the kitchen and bathroom
- Clean, modern design with warmth and personality
A Small Decision That Made a Big Difference
The most critical decision happened early.
Instead of attempting partial repairs, Frontier Building Group recommended fully rebuilding the structure after discovering the ant damage and squirrel nests. That choice eliminated risk, prevented future issues, and ensured the ADU would remain safe and durable long-term.
That moment turned a potential disaster into a successful project.
What the Clients Valued Most
Nancy and John valued more than the finished space. They appreciated:
- Frontier Building Group’s commitment to safety and doing things properly
- Clear communication through unexpected challenges
- The determination to complete the project before the new year, giving their daughter a fresh start in a secure home
It was about trust, reliability, and follow-through.
The Result
The result is a legal, independent ADU that delivers exactly what the family hoped for:
- A safe and secure home
- Full autonomy for their daughter
- A bright, thoughtfully designed space built to last
The project was completed on schedule, before winter, and before another year of uncertainty.
Quick Project Summary
138 King George Road, Brantford
Garage Conversion to Legal Bachelorette ADU
Frontier Building Group transformed a structurally compromised garage, affected by carpenter ants and squirrel infestation, into a bright, open-concept legal ADU. The project included a full structural rebuild, separated services, custom kitchen with island, in-suite laundry, a custom tiled 3-piece bathroom, and garden access via a new patio door. Completed in approximately eight months, the project delivered a safe, autonomous home for the clients’ daughter before the new year.
Ready to Build an ADU or Convert a Garage in Brantford?
If you are considering a garage conversion, ADU build, or secondary suite, Frontier Building Group brings the experience needed to handle structure, permits, services, and construction the right way.
We manage the entire process so your project is not just finished, but built to last.
📞 519.448.3946
🌐 www.frontierbuildinggroup.com
Frontier Building Group
We build like it’s our own home.

