You need more space. Maybe it’s for a parent moving closer, a grown child who can’t afford rent, or your own family outgrowing the house.
You’ve narrowed it to two choices. Build a separate home on your property, called an ADU. Or add onto the house you already live in.
Both can work, and in our projects both landed around $200,000. But they solve different problems, and picking the wrong one costs time and money. Here’s how to choose, using real projects we’ve built in Brantford and Hamilton.
TL;DR
- An ADU works as its own home, with its own kitchen, bathroom and living space. An addition gives your current house more room.
- Choose an ADU for privacy or rental income. Choose an addition when everyone wants to live together.
- Both need a building permit. Your lot often decides which one is possible.

What’s the difference between an ADU and a home addition?
An ADU, or accessory dwelling unit, is a second home on your property. It has its own kitchen, bathroom, sleeping area and front door. It can be a garden suite in the backyard, a converted garage or a basement apartment.
A home addition makes your existing house bigger. It might be a new family room, a main-floor bedroom or a bigger kitchen. Everyone still lives as one household.
The real question is this. Does the space need to work as its own home, with its own kitchen, bathroom and living space?
If yes, you’re looking at an ADU.
If they’ll share your kitchen and your daily life, an addition is usually the better fit. It can still have its own entrance.
| ADU | Home addition | |
| What you get | A separate home | More room in your house |
| Best for | A parent, adult child or tenant who wants independence | A family that wants to live together |
| Privacy | High, with its own entrance | Shared with the main house |
| Rental income | Possible, if it meets the rules | Not as a separate rental |
| Disruption while you build | Less inside, more yard and service work | Walls open into rooms you use every day |
| Our real project budgets | $170,000 to $200,000 (garage conversion), about $200,000 (garden suite) | About $180,000 to $210,000 (Hamilton rear addition) |
These are completed budgets, not quotes. Here’s what about $200,000 bought:
- Brantford garage conversion ($170,000 to $200,000): a studio with a full kitchen, bathroom, laundry and its own power and water. The budget covered design, permits and construction, including rebuilding a rotted frame.
- Brantford garden suite (about $200,000): a new 12 by 20 foot home, about 240 square feet, with a kitchen, bathroom and raised walkway to the house.
- Hamilton rear addition ($180,000 to $210,000): a new main-floor living area and safer basement access, plus a minor variance.
The timelines measure different things. The garage conversion’s eight months include design and permits. The garden suite’s three months is build time only.
Project costs vary by scope, site conditions and what’s included. Confirm whether HST, servicing and permits are covered when comparing quotes.
When does an ADU make more sense?

Choose an ADU when the person living there needs their own space, or you want rental income later.
Nancy and John in Brantford wanted a safe, independent home for their daughter. Their garage looked like the easy answer. Then demolition began. Carpenter ants had rotted the frame, so we rebuilt it from the ground up.
Their daughter has her own front door, steps from her parents. Read the full Brantford garage conversion story.
An ADU also works well for a parent. We built a garden suite for Paula’s mother after she downsized, joined to Paula and Aaron’s house by a raised walkway. See the Brantford backyard suite project, or our garden suites and ADUs page.
When does a home addition make more sense?

Choose an addition when the family wants to live under one roof, or when your property is better suited to expanding the house.
The Lasky family in Brantford wanted to live mostly on one floor and make the house safer as they aged. They didn’t need a separate suite. They needed the house to work better.
We built an addition with a flexible living room behind frosted glass French doors, a new powder room and safety bars in the bathroom. The project took two months. Read the Franklin Street addition story, or see our home additions page.
Sometimes the lot makes the choice for you. A homeowner in Hamilton first asked us about an ADU on her daughter’s property. Our review of zoning, setbacks and servicing showed an ADU wasn’t the right path.

So we built a rear addition on her own home instead. It needed a minor variance, which is permission to go beyond the usual zoning limits. Between the variance, permits, winter weather and her own design changes, the project ran from March 2025 to June 2026. See the Hamilton home addition case study.
Which option will your property support?
Your lot often decides before your budget does. Here’s what to check.
| Question | Points to an ADU | Points to an addition |
| How much yard do you have? | Room for a second building and equipment access | A small yard, but space beside or behind the house |
| Is there an existing garage? | A sound garage you no longer need | No garage, or you need the parking |
| Can water, sewer and hydro reach a new building? | Yes, without a long or costly run | Easier to extend from the house |
| Does zoning allow it? | A second unit is permitted on your lot | An addition fits within the limits, or a variance is possible |
| Who will live there? | Someone who needs a full home of their own | Your own household |
If you’re on septic, check it early. A second home sends more wastewater into the system. Make sure it can handle the load, or plan for an upgrade. Our guide to ADU water, sewer, septic and hydro explains what to look at.
Do you need a permit for an ADU or an addition?
Yes, for both. An ADU creates a second home, and an addition changes the size and structure of your house. Either way, you need a building permit before work starts.
An ADU also has to meet the rules for a separate home. That means fire separation, its own exits and proper heating.
An addition has to fit your lot’s zoning limits. If it doesn’t, you may need a minor variance, like our Hamilton homeowner. That can add months.
In the Brantford area, first check which municipality you’re in. The City of Brantford and the County of Brant are separate. Each has its own zoning rules and permit office. Paris, St. George and the rural areas around the city fall under the County. If that’s you, our step-by-step guide to getting an ADU permit in Brant County walks through the process.
How can you pay for an ADU or an addition?
Most homeowners use their home equity. Two programs are worth knowing if you’re building an ADU.
Refinancing to add a secondary suite. CMHC-insured refinancing lets owners borrow up to 90% of the home’s value once the suite is built. The finished home must be worth under $2 million. The suite must be self-contained, and it can’t be a short-term rental.
Borrowing depends on lender approval, your equity and program eligibility. The extra money must go toward building the suite.
Multigenerational Home Renovation Tax Credit. Is the new unit for a family member who is 65 or older, or an adult who qualifies for the disability tax credit? Then you may claim a credit on up to $50,000 in costs. The credit uses the lowest federal tax rate, which dropped to 14.5% for 2025 and 14% for 2026. That’s up to $7,250 for 2025 or $7,000 from 2026. You claim it for the tax year the renovation is finished.
The unit must be self-contained, with its own entrance, kitchen, bathroom and sleeping area.
An addition that only adds rooms won’t qualify for either. Check with your lender and accountant first.
Which one should you choose?

Choose an ADU if:
- The space needs to work as a full home of its own
- You may want rental income later
- Your yard, garage or services can support a second home
Choose a home addition if:
- Your family wants to live together under one roof
- You need more main-floor space, not a separate unit
- Your property is better suited to expanding the existing home
Find out what your property can hold
Most of the trouble we see starts with a plan that doesn’t fit the lot. A garage that’s rotten inside. A yard that can’t meet zoning. A septic system that can’t take a second home.
Book a free property assessment. We’ll walk your lot, tell you whether an ADU or an addition fits and give you a realistic cost range before you commit to anything.

